I’m in California. Your supplier is in China. I work in the middle.

I help U.S. companies turn China-built equipment into products that can clear code, survive the field, and keep operating when the factory is twelve time zones away.

Based in the San Francisco Bay Area · Available for select engagements

4U.S. sites launched and operating
3 weeksfirst container to running machine
U.S. ↔ Chinafield-to-factory feedback loop

01 — Selected work

From containers and code reviews to operations that stay open.

01 / First U.S. deployment

Five containers to a running machine.

Before the first system landed, every crate had a place, an unloading order, temporary storage, waste removal, and a plan for keeping cars moving through a cramped gas-station forecourt. Two crews worked in parallel on utilities and equipment. Three weeks from container to running machine, ahead of schedule.

3 weeksfrom arrival to operation

02 / Operating system

The system around the machine.

Hardware from overseas does not arrive with an American business attached. I built technician dispatch, spare parts, chemicals and water treatment, monitoring, payments, memberships, customer service, reporting, and the loop back to China-based engineers. I also built the internal operator platform for multi-site operations.

24/7unattended operation

03 / Operator, not just advisor

A turnaround while raising prices.

At a Fremont gas-station car wash, the site and twenty-year-old equipment stayed the same. I changed the operating model: pricing, memberships, payments, service response, and accountability. Two months later, revenue had grown from $5,306 to $23,678. Monthly revenue peaked at $57,788.

4.5×monthly revenue in two months

02 — What I do

01

Supplier selection and management

I can visit the factory, negotiate in Chinese, read the contract in both languages, and separate what a plant can build from what its sales team is willing to promise.

02

Getting Chinese-built hardware through American code

The gap between factory-ready and NEC or UL compliant is often cheap to fix before shipment and expensive to fix in a parking lot with an inspector standing there.

03

Getting field data to engineers who can act on it

I turn a failure in California into evidence a China-based engineer can diagnose, trust, and redesign around — or tell you honestly when the factory will not fix it.

04

Being the person on the ground

I am in the Bay Area: available for a site visit in the morning and a conversation with the factory that night. Someone still has to stay awake for the time zones.

03 — Background

Engineer’s rigor.
Operator’s instinct.

I spent most of a decade at Oracle and Meta building cloud and machine-learning infrastructure. Then I spent three years bringing a Chinese manufacturer’s equipment into the United States: customs, compliance, installation, service, software, and the necessary arguments about what had to change before the next unit shipped. I have run the U.S. entity of a Chinese group, so I know how the same conversation sounds in each room.

2013—2020 Oracle · Cloud infrastructure2020—2023 Meta · ML infrastructure2023—2026 JetX / YIGOLI · North America